Skip to main content
Version: 3.10.x

Software Item Lifecycle

Every software item in System Design has a status that shows how far its design has been reviewed. Open the item and use the lifecycle buttons in its detail view to move it from one status to the next.

StatusMeaningActions available
DraftThe design is being written.Approve
ApprovedThe design has been reviewed and signed off.Verify, Revert to Draft
VerifiedThe design has been verified.Revert to Draft
DeprecatedThe item is retired and cannot move to another status.None

The Deprecate action is described at the end of this page.

Approving and verifying​

  • Approve moves a Draft item to Approved. You can add a note explaining the approval. Only members with the Admin role in the project can approve.
  • Verify moves an Approved item to Verified. You can add a note.

Both actions need write access to System Design.

Revoking an approval​

If an approved or verified item needs to change, revoke its approval.

  1. Open the software item and choose Revert to Draft.
  2. Enter the reason for revoking the approval. It is required and must have at least 10 characters.
  3. Confirm.

The item returns to Draft and needs to be approved again. The reason is kept in the item's history together with who revoked the approval and when.

Only members with the Admin role in the project can revoke an approval, and they also need write access to System Design. A deprecated item cannot be reverted.

Deprecating​

Deprecate retires an item. A reason of at least 10 characters is required, and a deprecated item cannot be moved back to another status.