Skip to main content
Version: 3.x (Current)

Configuration

After installation, Mia-Care qualified personnel configure Mia-Care P4SaMD to match the customer’s requirements.

Configuration Activities

  1. JIRA Integration (Mandatory): Required to synchronize data between JIRA and Mia-Care P4SaMD. This includes:

    • Mapping JIRA Issue Fields: Aligning the JIRA issue fields with the P4SaMD data model.
    • Setup of JIRA Webhooks: Configuring webhooks on JIRA projects so relevant data reaches P4SaMD in real time.
    • Setup Jira Project Link (Optional): Linking the JIRA project URL within P4SaMD for direct navigation between the two systems.
  2. Console extension with Single Sign-On: P4SaMD runs as a Console extension with SSO, using the Mia-Platform Console authentication and authorization flow. This avoids additional logins and keeps security policies in the Console. For Console roles and permissions, see the official documentation.

  3. Test Framework Setup (Optional): Mia-Care can configure the testing framework for automated integration and system testing. This includes:

    • Setting up and enabling automated test tools for quality assurance.
    • Configuring test cases and workflows to validate system functionality and performance.
note

Customers may also choose to perform this configuration independently at a later stage using the provided documentation.

Configuration Completion

Once the requested configurations are complete, Mia-Care provides a detailed summary of the activities performed and of the resulting settings.

For additional customization or support, contact Mia-Care’s support team.